Successful delivery of main equipment
The project formally entered the installation and commissioning phaseMain equipment successfully delivered, project officially enters installation and commissioning phase.
Recently, TICA-EXERGY, an enterprise of Nanjing Economic and Technological Development Zone (NJEDZ), and its partner Geothermal Engineering Ltd, designed and constructed theThe United Downs geothermal power station project in Cornwall, UK, has seen significant progress. The power station is the first deep dry-heat rock geothermal power station in the UK and will be officially commissioned by the end of 2024.
Recently, a significant development was achieved in the United Downs geothermal power station project. This project, situated in Cornwall, UK, is designed and constructed by EXERGY under TICA Energy, located in Nanjing Economic and Technological Development Zone, and its partner Geothermal Engineering Ltd. This power station is set to become the UK's first deep dry rock geothermal power plant and is scheduled to commence operations in late 2024. operations in late 2024.TICA-EXERGY Radial Centrifugal Turbine Delivery Site
TICA-EXERGY Radial Outflow Turbine (ROT) delivery site
UK's first dry-heat-rock geothermal project
Carbon reduction of over 6,500 tons/yearUK's first dry rock geothermal project reduces carbon emissions by over 6,500 tons/year
United Downs Geothermal Power Plant Construction Site
United Downs Geothermal Power Station Construction Site
The United Downs Geothermal Power Project utilizes geothermal fluids to generate electricity through the Organic Rankine Cycle principle using TICA-EXERGY's proprietary high-efficiency radial centrifugal turbine technology, using air-cooling as the cooling system and consuming no water.
The United Downs geothermal power station project utilizes the Organic Rankine Cycle (ORC) and employs TICA-EXERGY's exclusive high-efficiency Radial Outflow Turbine (ROT) technology to generate electricity, exploiting the heat of the geothermal fluid. efficiency Radial Outflow Turbine (ROT) technology to generate electricity, exploiting the heat of the geothermal fluid. Its condensing system is air- cooled, conserving water resources. Its condensing system is air- cooled, conserving water resources.
As the UK's first deep dry-heat rock geothermal project, two deep directional wells have been drilled, with the production well at a depth of 5,275 meters, the deepest on the UK mainland. The project is expected to save more than 6,500 tons of carbon emissions per year once it is officially in operation.
Two deep directional wells have been drilled for the project, with the production well to a depth of 5,275 meters, marking the deepest well on the British mainland. Once operational, the project is expected to save over 6,500 tons of carbon emissions annually.
High efficiency radial centrifugal turbine technology
Internationally leading thermoelectric efficiencyHigh-efficiency ROT technology leads the world in thermal efficiency
TICA-EXERGY Radial Centrifugal Turbine Unit
TICA-EXERGY's ORC system with ROT technology
In addition to geothermal applications
Tenga Energy's unique high-efficiency radial centrifugal turbine technology
It can also be widely used in the field of industrial waste heat utilization
It has high reliability, high power generation efficiency and high integration,
Advantages such as automatic grid-connection
Thermoelectric efficiency of low-temperature waste heat (80~300°C) will be
5%-9% from the current level of domestic
Upgraded to nearly 30%
Reach the international leading level
Beyond its application in geothermal fields, TICA ENERGY's exclusive high-efficiency ROT technology can be widely used in the field of industrial waste heat recovery, offering high reliability, high power generation efficiency, high integration, and the ability to automatically It elevates the thermal efficiency of low-temperature waste heat (80~300°C) from the current domestic level of 5%-9% to nearly 30%, reaching an international leading level.
Tenga Energy
Nearly 1,000 MW of installed capacity worldwideTICA ENERGY's global installed capacity is close to 1000MW
Tianjia Energy Base
TICA ENERGY Base
Focusing on energy utilization system solutions and renewable energy development, Tenga Energy is the world's leading company with ORC's full-spectrum, high-efficiency and advanced technology.The products are applied in six major energy markets, including geothermal (dry heat rock) power generation, industrial waste heat power generation, LNG cold power generation, biomass energy, solar thermal power generation and CO2 liquefaction energy storage, with a global installed capacity of nearly 1,000MW.
TICA ENERGY focuses on energy utilization system solutions and renewable energy development. It offers full-spectrum equipment and system of ORC with high efficiency and advanced technology. It offers full-spectrum equipment and system of ORC with high efficiency and advanced technology. Its products are applied in six major energy markets: geothermal (dry rock) power generation, industrial Its products are applied in six major energy markets: geothermal (dry rock) power generation, industrial waste heat power generation, LNG cold energy power generation, biomass energy, solar thermal power generation, and CO2 liquefaction storage, with a global installed capacity close to 1000MW. Its exclusive Radial Centrifugal Turbine ORC power generation technology achieves an isentropic efficiency of 93.65% far exceeding the industry levelIts exclusive ROT-based ORC system achieves an isentropic efficiency of 93.65% far exceeding the industry level. efficiency of 93.65%, far exceeding industry standards.