Meiyuan South Road Bridge across Qinhuai New River Project
It's about to open in June;
Located in Jiangbei New District
Another high-end medical device project topped out;
Pukou People's Hospital is expected to
Completion and acceptance in September this year
......
Going full throttle to speed up construction
Key Projects and Programs
The progress bar refreshes!
01 Riverside Avenue Yuhua Section Project
As a key node connecting Jiangning District, Yuhuatai District cross-district road network, Riverside Avenue Yuhua section of the progress of the project has been much attention. At present, the projectSuccessful completion of the first cast-in-place box girder casting for the mainline bridge in Banqiao sectionThe rest of the construction is progressing in an orderly manner.
Riverside Avenue Yuhua section is an important part of the Nanjing high speed road system "Ningwu (Riverside) axis", for the last link of the Nanjing section of the fast channel S338 along the river, the Nanjing metropolitan area transportation construction is of great significance. The whole road is about 6.9 kilometers, divided into Banqiao section and the open area section and other parts of the implementation of the expansion.Completion expected in 2025TheAfter the commissioning of the road, from the Riverside Development Zone to Yuhua, Hexi and other directions of the traffic will be more convenient for the city of high, expressway system to form a "well three rings, axial radiation, group fast link" pattern to lay a solid foundation.
02 Meiyuan South Road Bridge across Qinhuai New River Project
The project starts from Pipeline Road, extends northward after crossing Qinhuai New River, and ends at Fushan Road, with a total route length of 850 meters and a design speed of 40km/h. It is the first steel box girder arch bridge over Qinhuai New River. Since the beginning of spring, the construction unit is working fast and furious!Carrying out road and pipeline construction on both sides of the bridge connectionsProjectsExpected to be completed and open to traffic in June this yearAfter the commissioning, the neighboring residents can save about 10 minutes to travel between the two sides of Qinhuai New River.
03 National Highway 312 East Extension Project
As one of the key projects of the Municipal Transportation Bureau, the East Extension of National Highway 312 project starts from the intersection of Nanjing and Zhenjiang, extends westward along National Highway 312, and terminates at the completed Shugang section of National Highway 312. Up to now.The 600-meter section of the project (the third ring road to the end of the project) has completed the bridge pile foundation, bearing platform, bridge cast-in-place section and prefabricated piers and columns cover girders of prefabricated assembling work, is now prefabricated box girder production and installation of construction.
The second phase of 1600 meters (project starting point to the third ring road entrance) is now in the land formalities for the group volume stage, is scheduled to start construction in May 2024, the end of 2025, the elevated completed and open to traffic, in June 2026 the ground auxiliary road is completed and open to traffic. After completion, it will become one of the fastest highways from Nanjing to Zhenjiang, effectively improving the travel conditions of residents along the route, serving the integrated development of Ningzhen and Yangyang, and promoting economic and social development along the route is of great significance.
04 Pukou People's Hospital Phase III
Pukou People's Hospital Phase III project for the city's major projects, the construction of a total construction area of 252,000 square meters, after the completion of the new ward 24, more than 1,000 new beds. Up to now.The overall image progress of the project has reached more than 80%The installation of electromechanical piping and the construction of the curtain wall are being finalized, while interior decoration, installation of various medical specialties and renovation work are under way.Completion and acceptance of the project is expected to be carried out in September 2024.
05 Jiangsu Huatian IC wafer-level packaging and testing base expansion project
The project is located in Pukou Economic Development Zone and invested by Huatian Technology (Jiangsu) Co. The project has a total investment of 2.25 billion yuan, a total construction area of about 200,000 square meters, the construction of the international leading level of integrated circuit wafer-level Gold Bump sealing and testing production line, high-pixel image sensor packaging and testing production line, integrated circuit wafer-level sealing and testing production line. After the completion of production, it is expected that the annual output value of 2.6 billion yuan, the annual tax 160 million yuan, can drive the employment of 1130 people.
At present, the main body of 1# plant has been completed, and the main body of 3# plant is under construction; the interior of the dormitory building is being renovated, and the main body of the R&D building has been roofed.
06 Nanjing Xinai IC Packaging High-end Substrate Phase I Project
The project is located in Pukou Economic Development Zone, invested and constructed by Core Ai Technology (Nanjing) Co. With a total investment of 4.5 billion yuan and a total construction area of about 128,000 square meters, the project focuses on the research, development and production of high-end substrates, the core material of the integrated circuit industry. After the completion of production, it is expected that the annual output of high-end substrate 1.45 million pieces. It is expected that the annual output value of 4 billion yuan, the annual tax revenue of 200 million yuan, and can drive the employment of 2,400 people.
At present, the project entity has been fully completed, some production lines have completed equipment commissioning and small-scale production.
07 Nanjing Guozhao Optoelectronics OLED Microdisplay Expansion Project
JINXIN Middle Road to the north, west of General Avenue, Nanjing, Nanjing Guozhao photoelectric OLED microdisplay device expansion project site, more than 160 workers are in full swing for the main construction, the project is one of the municipal major projects in the Jiangning Development Zone this year.
In order to expand its production capacity, Kokusai Optoelectronics intends to build a 12-inch silicon-based OLED microdisplay device production line at the new site to realize an annual output of 4 million units of displays.At present, No. 1, No. 2 and No. 3 plant at the same time to promote the construction, is expected to be topped out in July this year, the end of the year into use.After the completion of the project, it will further enhance the enterprise's R&D and production capacity, help the company to fully enter AR, VR and other emerging industries, and contribute more to the development of new quality productivity for the park and enterprises.
08 Weidun New Energy Production Line Project with an Annual Output of 35 Sets of Dichloromethane Gas Recovery Devices
On the morning of March 11th, Nanjing Weidun New Energy Technology Co., Ltd. has an annual output of 35 sets of extra-large dichloromethane gas recovery device production line project.existSeokchu Industrial Park openedThe project has a total investment of 500 million yuan. The project has a total investment of 500 million yuan, divided into three phases of construction, completion of production is expected to achieve annual tax revenue of more than 25 million yuan, driving employment of more than 200 people.
Weidun New Energy has long been committed to the design, manufacture and sales business of product units such as low-temperature cascade refrigeration units and oil and gas recovery units. The company successfully developed dichloromethane gas recovery technology, and successfully entered the field of lithium battery diaphragm environmental protection technology, filling the domestic technology gaps in this niche field.
09 Base egg biological in vitro diagnostic instruments and reagents industrialization project
March 8In vitro diagnostic instruments and reagents industrialization project of Egg Bio-Tech Co., Ltd. located in Jiangbei New District Intelligent Manufacturing Industrial Park was topped out.
The project is located in Jiangbei New District, No. 1 Qiancheng Avenue, with a total construction area of 95,912.32 square meters, started on June 4, 2023, with a total investment of about 400 million yuan.Completion and delivery expected in 2025. As a major industrial project of the city, the project took only 222 days to level the ground. In the future, it will expand the product system with chemiluminescence, coagulation, pipeline and molecular as the grips, and build up a high-end medical device manufacturing cluster based on POCT strip line.